Islamabad January 20 2025: Oil and Gas Development Company increases production from its existing well Pasakhi-7 and start production from well Chak 212-1 at Mari East, according to company filing to the exchange.
Oil & Gas Development Company Limited (OGDCL) announces the enhancement of oil production from the Pasakhi-7 well, located in District Hyderabad, Sindh. The well is part of the Pasakhi Development & Production Lease (D&PL), where OGDCL holds a 100% working interest.
As part of its optimization efforts, OGDCL deployed a rig to replace the tubing and re-complete the well using an artificial lift system (Jet Pump). Additionally, the Company introduced Multiphysio Chemical Stimulation technology, marking its first use in the Southern Region. These measures have increased production at Pasakhi Well-7 from 375 barrels per day (BPD) to 520 BPD, an increment of 145 BPD.
Chak 212-1, which is an exploratory well, is the first-ever discovery in the Mari East Block, located in the Rahim Yar Khan district of Punjab province, where OGDCL holds 100% working interest.
Following the laying of a 4”-14.5 km flow line from the well site to Maru-1 facility, gas from Chak 212-1 is now being supplied to M/s Engro Fertilizer. Currently 2.0 MMSCFD gas is being supplied. OGDCL remains focused on optimizing production, ensuring energy security, and fostering sustainable development.